Vol. 5 No. 1 (2024): Jurnal MESIL (Mesin Elektro Sipil)
Articles
-
Analisis Kelayakan Investasi Pada Bangunan Puskesmas Halong Dengan Metode Net Present Value
abstract views: 457 times
downloaded: 502 times
DOI : https://doi.org/10.53695/jm.v5i1.1039
-
Evaluasi Elemen Lanskap Pada Taman Wisata Meuraxa Banda Aceh
abstract views: 392 times
downloaded: 381 times
DOI : https://doi.org/10.53695/jm.v5i1.980
-
Dokumentasi Bangunan Bersejarah Masjid Raya Lima Kaum Kabupaten Tanah Datar
abstract views: 29 times
downloaded: 144 times
DOI : https://doi.org/10.53695/jm.v5i1.981
-
Memahami Keberadaan Street Vendors di Jalan Samudera 1 Kota Lhokseumawe
abstract views: 39 times
downloaded: 50 times
DOI : https://doi.org/10.53695/jm.v5i1.992
-
Teknik Pembuatan Peta Administrasi Pada Kota Kuala Simpang, Kabupaten Aceh Tamiang
abstract views: 410 times
downloaded: 477 times
DOI : https://doi.org/10.53695/jm.v5i1.993
-
Pola Pemanfaatan Ruang Pada Pasar Tradisional Balige
abstract views: 114 times
downloaded: 162 times
DOI : https://doi.org/10.53695/jm.v5i1.1002
-
Identifikasi Karakteristik Arsitektur Kolonial pada Fasad Bangunan Istana Karang, Istana Benua Raja dan Pendopo Bupati Aceh Tamiang
abstract views: 149 times
downloaded: 153 times
DOI : https://doi.org/10.53695/jm.v5i1.1003
-
Kajian Penerapan Konsep Arsitektur Modern Pada Gedung BPJS Kesehatan Cabang Lhokseumawe
abstract views: 151 times
downloaded: 132 times
DOI : https://doi.org/10.53695/jm.v5i1.1004
-
Identifikasi Arsitektur Kolonial Terhadap Bangunan T. Bustamam, Meuligoe Bireuen dan Rumoh Ampon Loethan
abstract views: 87 times
downloaded: 110 times
DOI : https://doi.org/10.53695/jm.v5i1.1005
-
Analisis Pengendalian Kualitas Hasil Uji Tarik Material Plat ST 37 Dengan Menggunakan Metode SPC
abstract views: 286 times
downloaded: 397 times
DOI : https://doi.org/10.53695/jm.v5i1.1044
-
Evaluasi Tebal Lapis Tambah (Overlay) dengan Metode AASHTO 1993 dengan Data FWD
abstract views: 165 times
downloaded: 138 times
DOI : https://doi.org/10.53695/jm.v5i1.1049
-
Analisis penerapan Metode Fast Track Pada Proyek Pembangunan Jembatan Aek Hulim Kabupaten Padang Lawas
abstract views: 286 times
downloaded: 138 times
DOI : https://doi.org/10.53695/jm.v5i1.1069